Tuesday, April 27, 2010

Practice Facility Renovation




Yet another phase of our ongoing project has begun. We started the renovation of our practice range and chipping area almost a week ago. Our previous facility was the last area of the golf course that hadn't been updated to match the restoration which has taken place throughout the rest of the property over the last decade. Our goal is to not only make the area more functional for use by our teaching professionals, members and guests, but to also bring the same themes to the practice areas that we are incorporating on the rest of the property (i.e. native grasses, flowing undulations, and short mowed chipping areas).




We eliminated two out of the three practice bunkers and re-shaped the green surrounds to make room for more short-mowed chipping area around the practice green. While before there was only about 200 square feet of short-mowed chipping area there will now be approximately 10,000 square feet.



We started the process on our driving range about three weeks ago by spraying the grass out with Round-up. The shaper then came in and tilled the soil so that it would be easier for him to shape using the bulldozer. We changed the shape of the driving range surface to allow for better surface drainage as well as the installation of new target greens. We sodded the target greens by using material that we saved from the existing driving range tee. After the removal of the sod from the teeing area the shaper was then able to begin the leveling process.




The final touch will be a bio-swale that will run in front of the artificial tee and to the right side of the grass teeing area to help add a landscape element to the tee as well as act as an attractive alternative to a drainage ditch. The bio-swale will be un-irrigated and will be a mix of native grasses, sand, and rocks.

Monday, April 12, 2010

Progress Report



It's been a while since our last update regarding Pasatiempo's move toward water conservation, so there are several things to cover. The new irrigation system installation has been completed on the front nine and everything is programed and running by our central control. This is a huge relief considering to the 80 degree weather that is fast approaching. Holes 10, 17, and 18 are completed on the back nine, and they are getting ready to start pulling laterals and installing heads on number 11.







We have finished spraying out areas for future native grass conversion throughout most of the back nine, and have hydroseeded about four more acres of new area over the past two weeks on holes 1, 2, 5, 6, 7, 8, and 9. The first areas we seeded several months ago on holes 1, 5, and 6 have really started to progress with the warmer temperatures and we now have six to eight inches of growth in the native grass areas that border these holes.





We've also completed the relocation of the 9th forward tee out of a future native grass area into line with the rest of the 9th tee complex. We were able to use the sod from the existing tee and transfer it over to the new location once the prep work was done.




Friday, March 26, 2010

Creating a Natural Flow

Next week we will begin a project in which the forward tee at the 9th hole will be relocated. The new tee will be moved immediately to the right and it will be in direct line with the other teeing areas. The distance from tee to green will remain the same at 420-yards. This will accomplish a more architecturally sound teeing complex in which the green island in the middle of native grass will be eliminated. This will also take out the unsightly mounded tee and obtain a more natural appearance to this area. Moving the tee further to the right will prevent players having to carry the native rough. Carts will not be allowed to drive up to the new tee, but a walk path from the existing cart path will provide foot and pull-cart access.



































Tuesday, March 2, 2010

New Technology at the 2010 Golf Industry Show



After attending this year's G.C.S.A.A. Golf Industry Show in San Diego, California I returned with the realization that our industry is a group of innovators on the forefront of the sustainable movement. All of the major companies were showcasing their versions of either hybrid or completely electric equipment. The "big three" equipment companies (John Deer, Toro, and Jacobsen) were all displaying some form of their new environmentally sustainable mowers, rollers, etc.


Some of the smaller companies are even further ahead of the curve with products such as a fully robotic greens mower that allows one operator to be raking bunkers, hand watering, or whatever else may need to be taken care of while the mower mows the green on its own. While the innovative equipment was obviously the highlight there are also advances being made by chemical and irrigation companies to become more environmentally sensitive as well. Toro and Rain Bird irrigation are both introducing new operating systems that will make irrigation programming and operation much more efficient, one of which is Toro's Lynx system which we will be installing late this summer along with our new irrigation system.



Overall I feel that the Golf Industry Show is a great opportunity for anyone in the golf maintenance industry to further their education and awareness with regards to new innovations and technologies in the interest of becoming more environmentally conscious in our day-to-day lives as turf managers.

Saturday, February 27, 2010

Our Native Grass Blend

One of the most frequently asked questions’ lately has been with the native grass hydro-seeding project. What does all this native grass stuff mean?

The goal and strategy of the club is to create world class conditions in keeping with the fine tradition of a MacKenzie course. As the price and availability of precious water resources continue to drive our operation, we are eliminating nearly 30-acres of previously irrigated turf. This will be a major change in the appearance of the golf course and many clubs especially in California will be faced with the same adversity, they must cut water and other costly maintenance practices that are required to keep a golf course wall-to-wall green. This process will take time to evolve, and many areas will look barren for the first few years. Native grasses are vastly different from the turfgrass species that we maintain on a daily basis. They take time to grow, and several years to fill in an area. The expectation for these areas cannot be set too high for the first several years, otherwise everyone will be disappointed. Every golf course is different in regards to growing conditions, soil types, seasonal changes, etc. Therefore, when someone asks what these grasses will look like, it is hard to explain.

 
 Our specific seed blend will react differently here than other areas of the country. We have spent a tremendous amount of time researching specific native grasses. We have selected six species that will help achieve our goal of creating native areas that will not become so thick that they cannot be played out of, will provide a wonderful habitat for wildlife, significantly reduce costly maintenance inputs including water, and help return the course to a more traditional links-style course. In speaking with our seed company, they have helped to identify one golf course that has planted a native grass blend similar to ours. The following pictures are from this course and these pictures were approximately three years following seeding of the native grass blend.


Keep in mind these grasses will not be watered during the summer months and will be thinner that what they appear in these pictures. Our intent is to be able to play from these areas and for them not to eat up lost balls.

Friday, February 19, 2010

Creating a Minimalist Look



Area surrounding the 7th tee as it currently appears. All
landscaping plants will be removed, including the wood steps
and rubber matting. The area will then be sodded with
ryegrass to create a simple blend from the 6th green to 7th tee.

In keeping with our club strategy of creating a minimalist look along with keeping high environmental standards, the landscaped areas throughout the golf course will undergo a transformation. No longer will we change out the annual flowers and plants each spring and fall as we look to blend the native grass look into these locations. The landscaping surround the 7th tee will be completely removed including the one-step staircase. This “buffer” between the 6th green and 7th tee does not fit with our goal of creating uniformity throughout the golf course and it currently looks out of place. With the native grasses assuming these locations, there will be less maintenance, little or no water required, and the seasonal changes in the grass varieties will offer a dramatic character to the golf course. The most significant change was the removal of all non-native blackberries and rosemary surrounding the #2 tee hillside and facing Clubhouse Road. This was a major eyesore that has been seeded with our native grass mix and will now blend in better with the appearance of the course. 






Previous view from Clubhouse Road looking up to the 2nd 
teeing area. This was a major eyesore and the first 
impression of the golf course. All rosemary and blackberry 
plants have been removed.

















 
 

The current view of the 2nd teeing area following
hydroseeding of the hillside with native grasses.

Friday, February 5, 2010

El Nino Wreaking Havoc


Over the past week we have witnessed fairly dry weather for the most part, despite the nearly two-inches that fell last night.  With the break in the rain the maintenance crew has been able to catch up on most of the mowing and clean-up following the ten inches of rain that fell during the last half of January.  One area that remains an issue is the bunkers, which we oftentimes forget are hazards.  Due to the vast amount of damage that was caused during our last series of storms, as well as the ongoing sub-surface irrigation installation around the bunkers they are not in as good of shape as during the prime golfing season.  For our golf course maintenance staff it becomes a “catch 22” because when we rake the bunkers the sand becomes fluffed up and much more mobile, therefore eroding more severely when it rains causing us to have to spend valuable time and resources in repairing these areas only to watch them wash away with the next rain.  However, when the bunkers are not raked as often they will become compacted by the rain and somewhat unsightly.  As the irrigation installers make progress on the subsurface system, and we feel that we will not be wasting time or resources, and the maintenance crew will follow behind the irrigation crew and edge, cleaning, and then add new white sand to the bunkers as we prepare for the upcoming season.  Moving forward, you should recognize improvements in this aspect of the golf course’s maintenance program, primarily based simply on the optimal weather that accompanies the spring season.  Rest assured that we are doing our very best to produce a high quality product on a daily basis for our members and guests while at the same time responsibly manage the funds and resources that we have available to us with regard to the bunkers.

My blog has moved!

You should be automatically redirected in 6 seconds. If not, visit
http://pasatiempomaintenance.com